S(J03): Tape Logging Complete

Just finished logging in the third and final tape for S(J03), and I’m pretty relieved/excited. At first, three hours of footage for a 5-minute film seemed daunting, like we’d never be able to cull it down, but after watching it all, it’s won’t be a problem. That makes it sound like there’s only 5 minutes of usable footage in the whole day, which is not the case at all. With a lot of long takes and exploring, there is more extraneous stuff; it’s just that there are some shots which are so clearly good, you can flag them right away.
When we shot the ironing scenes at the hotel, for example, we went start-to-finish on three shirts. (Ironing? Huh? Read the script.) By the third shirt, Patrick, the cinematographer, had really gotten a feel for it; his intimacy and comfort with the camera come through as he shot the entire shirt in one continuous take.
As soon as I get the Powerbook set up for editing, I’m off. Detailed logging means I’ll probably only capture about 20 minutes of video, which is very manageable.